Skip to content
YGHP Logo YGHP Logo
  • HOME
  • ABOUT
    • ABOUT YGHP
    • YGHP NEWS
    • CASE STUDIES
    • CONTACT
  • INTERFACE UNITS
    • INDIRECT HEAT INTERFACE UNIT
    • DIRECT HEAT INTERFACE UNIT
    • COOLING INTERFACE UNITS
    • COMBINED DHW, HTG & COOLING INTERFACE UNIT
  • METERS AND BILLING
    • HEAT METERS
    • WATER METERS
    • THERMALEE ROOMSTAT
    • DATA LOGGING
    • MONITORING
  • PLANTROOM EQUIPMENT
    • STORAGE TANKS
    • SEPARATORS
  • PARTNERS
    • AQUABION
    • DIEHL
    • ELYSATOR
    • KOZANLAR
    • SWEP
    • DISTRIBUTORS & STOCKIST

CASE STUDY – HORNSEY TOWN HALL

CASE STUDY – HORNSEY TOWN HALLSam2021-07-15T15:20:06+00:00

122

HIUs Ordered

HORNSEY TOWN HALL

This development is set to preserve the history of the iconic grade II* listed Hornsey Town Hall by giving it a new breath of life. Directed by Ardmore construction and Whitecode Design Associates, the restoration plans set to revive the local community by providing a new arts centre, co-working/flexible workspaces, a cinema restaurants/cafés and versatile event spaces.

Along with the restoration comes 146 new residences within the grounds of the town hall, across 2 newly-built blocks. Located only a stones throw from central London this is the perfect setting for inner city commuters looking for local affordable housing. YGHP will be working closely with NWP to provide this exciting restoration with 122 indirect heat interface units.

YGHP indirect heat interface units provide a clean and reliable source of hot water and heating directly to the home and also reduce the carbon footprint of the entire development.

Contact Us

01543 396300
sales@yghp.co.uk

YGHP Limited
Unit 9 Hemlock Park
Hyssop Close
Staffordshire
WS11 7FB

Follow Us

Site Links

  • Home
  • Online Shop
  • Contact Us
  • Site Report
  • Warranty Form
  • Pre Commissioning Form

Specifications

HIU Installation Manual

BESA Test Regime

YGHP – 2021 Product Catalogue

YGHP Datasheet Request

Copyright YGHP. Powered by Red Website Design