Skip to content
YGHP Logo YGHP Logo
  • HOME
  • ABOUT
    • ABOUT YGHP
    • YGHP NEWS
    • CASE STUDIES
    • CONTACT
  • INTERFACE UNITS
    • INDIRECT HEAT INTERFACE UNIT
    • DIRECT HEAT INTERFACE UNIT
    • COOLING INTERFACE UNITS
    • COMBINED DHW, HTG & COOLING INTERFACE UNIT
  • METERS AND BILLING
    • HEAT METERS
    • WATER METERS
    • THERMALEE ROOMSTAT
    • DATA LOGGING
    • MONITORING
  • PLANTROOM EQUIPMENT
    • STORAGE TANKS
    • SEPARATORS
  • PARTNERS
    • AQUABION
    • DIEHL
    • ELYSATOR
    • KOZANLAR
    • SWEP
    • DISTRIBUTORS & STOCKIST

CASE STUDY – CLAYGATE HOUSE

CASE STUDY – CLAYGATE HOUSESam2021-07-21T09:04:46+00:00

73

HIUs Delivered

CLAYGATE HOUSE

This development comprises of 3 inter – connecting office buildings; Claygate house, Rythe House and The Link Building. Located in Esher, Surrey, this project is a redevelopment to breathe new life into a build from the 70’s.

The build will include 59 residential apartments, 15 new apartments via a roof extension and communal space for the residents. With direct links to the city of London by train this location is an ideal residential location.

YGHP provided 73 heat interface units for the build to provide a stable, reliable heating system throughout. By supplying our units the development can retain the its plans to make this green build and help move towards a carbon neutral future.

Contact Us

01543 396300
sales@yghp.co.uk

YGHP Limited
Unit 9 Hemlock Park
Hyssop Close
Staffordshire
WS11 7FB

Follow Us

Site Links

  • Home
  • Online Shop
  • Contact Us
  • Site Report
  • Warranty Form
  • Pre Commissioning Form

Specifications

HIU Installation Manual

BESA Test Regime

YGHP – 2021 Product Catalogue

YGHP Datasheet Request

Copyright YGHP. Powered by Red Website Design